Each will cover 37.5 km2 area and generate 400 MW of electricity with 25 km2 of that used as greenhouse area. Imagine, 6,177 acres of greenhouse that produces 400 MW of electricity. The chimney would be 920 ft diameter by 4,921 feet tall
GREENTOWER TECHNOLOGY AND COST
1. WORKING MECHANISM
Visible radiation from the sun and (overcast) sky heats the air inside the glass covered collector, the buoyancy of which causes an up-draught inside the centrally situated tall chimney flue driving turbine(s) with integrated generator(s) at the chimney foot. Present solar to power efficiency is 4%, theoretical (Carnot) limit = 25%, practical limit = development potential = 14%.
Vegetation inside the greenhouse increases power production according to Stellenbosch University, continuously researching the GT since 1998. The outer 2/3 of the collectors area is used as a greenhouse and for air heating at the same time. Evaporated water is re-condensed.
2. SPECIFICATIONS
● The concept of the GreenTower® (GT) follows Prof. Schlaichs Updraft Tower (Solar Chimney), but combines power station + greenhouse (high profits), recent international research results and unique experience in cooling tower design/building by Krätzig & Partner + related German experts.
● Flue height = 1 500m; flue-Æ:180 - 280m; collector-Æ: 6.9km; collector-roof height: 1030m
● Power rating: 400Mwel (pure solar, emission-free); 32 turbines at flue perimeter with integrated linear generators; plant load factor ³ 89%; availability = 97%
● 6 day full power quick-response thermal energy store + seasonal store Þ power at any time
● Collector area = 37.5km², dry area = 12.5km²; outer ring = greenhouse area = 25km²
● Greenhouse: Drip irrigation + humus soil (12% £ humus £ 25%); high yield-low cost organic agriculture (microbial nitrogen fertilization); composted plant matter buried in soil as humus
● CO2 sequestration per GT + related irrigation schemes » 2 000MWel of coal-fired power emissions
● Design life-span = 160 years, depreciation period ³ 80 years; construct. period = 3 to 4 years
● Capital cost: Dry GT: 475m; greenhouse implements: 90m; glass factory: 35m